LAVASTIDA DEVELOPMENT GROUP, LLC
  • Home
  • Services
  • Experience
    • Construction Management
    • Design Build
    • Facility Support
  • About Us
  • Build to Suit
  • Contact

Replace Underground Storage Tank

Demolishing existing asphalt pavement, including excavation for sub-base work and removal of existing pavement full depth and properly disposed of off base. Removal of existing steel pipe guard rails and handrails. Remove entire stair structure including drilled piers at outside corners. Repair cracked/broken concrete at upper wall area on north side of breezeway just inside face of building. Replace concrete stairs, retaining walls, and footings. Repair existing concrete basement structure.

Summary

Project Location: Oklahoma City
Cost: $757,952.00
Completion Date: 5/27/2020

Relevance

Replacement of underground storage tank with a new above ground storage tank.
​
Occupied facility

See Some Examples

© 2022 All Rights Reserved
  • Home
  • Services
  • Experience
    • Construction Management
    • Design Build
    • Facility Support
  • About Us
  • Build to Suit
  • Contact