LAVASTIDA DEVELOPMENT GROUP, LLC
  • Home
  • Services
  • Experience
    • Construction Management
    • Design Build
    • Facility Support
  • About Us
  • Build to Suit
  • Contact

Install Exit Door

Project Description: LDG served as the Prime contractor on this project. Work performed under this contract consists of the installation of an exit door in a tornado shelter in building 460 at Tinker Air Force Base (AFB), Oklahoma. The majority Scope of Work is to saw cut an opening in a concrete wall to accommodate a 3'0 x 7'0 door with a hollow frame. Prime Architects provided limited design/engineering service to complete a set of working documents for use during construction.

Demolition: Saw cutting a concrete wall to accommodate a 3'0 x 7'0 door with a hollow frame.

Construction: Welded hollow metal frame and new STC-50 3'0 x 7'0 insulated hollow metal door. Install lighting inside the vestibule and lighted exit signs. Install carpet tiles and new rubber base.

Key Features:
  • Saw cutting concrete to accommodate door.
  • Installing exit door for tornado shelter.

See Some Examples

© 2022 All Rights Reserved
  • Home
  • Services
  • Experience
    • Construction Management
    • Design Build
    • Facility Support
  • About Us
  • Build to Suit
  • Contact