LAVASTIDA DEVELOPMENT GROUP, LLC
  • Home
  • Services
  • Experience
    • Construction Management
    • Design Build
    • Facility Support
  • About Us
  • Build to Suit
  • Contact


Flooring and Ceiling Finishes Upgrade, East Addition

This project is being executed to replace the ground floor ceiling tile and lay epoxy/urethane and Vinyl Composition Tile (VCT) flooring in the main facility of the US EPA Robert S. Kerr Environmental Research Center (RSKERC).
 
The Main Building areas that received new Epoxy/Urethane flooring were the Loading Dock, the Loading Dock Storage, Ramp, Stairs and Mail Room. Areas the that received VCT were the Ground Floor, 1st Floor East Addition, 2nd Floor East Addition, 3rd Floor East Addition. All flooring laid matched the facilities existing flooring color and material type.

Summary

Project Location: Ada Oklahoma
Cost:$71,372
Completion Date: 09/21/2021

Relevance

Period of Performance 120 calendar days
Occupied Building

See Some Examples

© 2022 All Rights Reserved
  • Home
  • Services
  • Experience
    • Construction Management
    • Design Build
    • Facility Support
  • About Us
  • Build to Suit
  • Contact